![]() |
| |||||||||
![]() | ||||||||||
![]() | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Comprehensive rail transport consultancy | |
| Solution to special transport problems like over dimensional consignments | |
| Traffic analysis, site selection, pre-feasibility study | |
| Logistics review & Transport Risk Assessment studies | |
| Accidents Enquiry | |
| Safety Audit of Rail Systems | |
| Rail Terminal Master Planning |
| Reconnaissance Survey for route selection | |
| Preliminary & Final Location Survey | |
| Optimization of Alignment Plan & Profile | |
| Track Geometry Design and Detail Engineering | |
| Hydrological Studies for Bridges/Tunnels | |
| Design & Detailed Engineering of Bridges & Tunnels | |
| Costing and Tender Evaluation | |
| Construction Management | |
| Bridge Inspection |
Signalling & Telecommunication
| Map and Field Survey | |
| Feasibility Studies | |
| Modification & Improvements to existing systems | |
| System Planning and Design | |
| Detailed Engineering | |
| Tender Documentation | |
| Bid Invitation and Evaluation | |
| Project Preparation and Planning | |
| Installation Supervision, Testing and Commissioning |
Over Head Electrification (OHE)
| Survey and Feasibility Studies | |
| System Planning & Design (Overhead Equipment, Sub Stations, Switching Stations) | |
| Detail Engineering for the entire system including Earthing and Protection Systems | |
| Design of SCADA Remote Control System as per requirement | |
| Tender Documentation | |
| Bid Invitation and Evaluation | |
| Project Preparation and Planning | |
| Installation Supervision |
| Design/Sizing of Rolling Stock | |
| Assistance in repairs of Rolling Stock | |
| Design of Hopper Wagons, Container Flat Wagons, High Capacity Wagons | |
| Design for Shunting & Flame proof Locos | |
| Modification to Wagon Design. Problem Evaluation & Selection of agencies for Rolling Stock Repair | |
| Refurbishment of Locomotives/Wagons/Coaches |
| Pre-Feasibility, Feasibility and Detailed Project Reports for Railway Systems | |
| Detailed Engineering Drawings | |
| Project Planning and Scheduling | |
| Contracting Services including Bid Documents etc. | |
| Construction Management | |
| Quality Assurance and Inspection | |
| Manpower Planning, Recruitment & Training | |
| Project Audit |
| Economic and financial appraisal of rail infrastructure projects | |
| Socio-economic impact evaluation of projects | |
| Multimodal transport costing and study | |
| Total Transport System Study at Macro/Regional/Micro levels | |
| Traffic demand analysis and forecasts | |
| Logistics Management Study |
| Railway Operation and Condition Assessment | |
| Maintenance of locomotives | |
| Maintenance of wagons | |
| Maintenance of track | |
| Maintenance of signal equipment | |
| Maintenance of Overhead Electrical System | |
| Maintenance of workshop equipments | |
| Operation of locos |
| Organisational Structuring and Manpower Planning | |
| Skills Classification and Assessment of Training needs | |
| Curriculum Development | |
| Development of Training Infrastructure | |
| Setting up of Training Institutes | |
| Management of training institutes | |
| Delivery of Training in India or in client Country | |
| Logistics Support to Training Programmes | |
| Training of Trainers/Resource persons | |
| Monitoring and Evaluation |
|
Copyright © Balaji Railroad Systems Ltd. All Rights Reserved. | ||
|
Domain Registration, Website Design, Website Hosting by HamaraShehar.com | ||